Saturday, December 6, 2008

Up-to-date on the house

Progress so far....the shingles are complete, both sides of the house and the back of the house have siding on it, the front of the house is plastic wrapped and ready for the siding to be put on. We have windows and a sliding glass door. Both bath tubs are in place and the washer hook ups are in. The construction workers looked as though they were finishing up the eves on the house while we were there.



Back of house looking at the master bedroom window on the far right.
Back of house with master bedroom window and wall facing neighbors to the east.
Back of house looking at garage door on far left.
Front of house looking at right garage door and garage window.
Front of house looking at plastic wrapped garage doors.
Front of house looking at 2 spare bedrooms and front door/living room windows.
Inside house looking at laundry room.
Standing in dining room looking at living room and front door (that guy is the one who chose the propane tank placement. Smart guy :P )
Spare bedroom #1 from the door.
Master bathroom from inside bedroom
Master bedroom from hallway door.
Spare bedroom #2 from hall door.
Hall bathroom tub.
Master bathroom looking through the kitchen wall. Ha ha ha

No comments: