Sunday, January 18, 2009

Cabinets

The cabinets have been installed. They are a beautiful natural hickory with arched upper cabinets. I love the calico wood color through out it. Next is for the doors to be framed and hung up in the house. The doors are already in the house laying all over the place.

This is our beautiful kitchen with center island. Counter tops will come later.
Kitchen looking at refrig space and pantry area.
Center island looking towards dining area.
Kitchen looking at where the dishwasher will go. I already have material picked out to make some decorative curtains for this window, blue and white check with little yellow sunflowers all over it. It will be very pretty.
Here is our laundry room.The guest bathroom sink area.
Chris showing how tiny our linen closet is.
The master bath cabinets.
The master bath will have double sinks.
Here are our interior doors that are supposed to be hung this next week.
The doors have decorative arches at the top that match the arches on our upper cabinet doors.

Sunday, January 11, 2009

Texture

The walls in our house have been textured and the electrician is starting to install some lights in the garage. We also have garage doors now. This last week we drove to Sparks, NV to pick out all of our flooring. I think they said that this next week they would be doing framing to hang the inside doors. We still need to meet with the cabinet guy and go over the drawings he did, but they are looking very good already.

Chris in the kitchen with our electrician.
Chris and the 2 electricians in the kitchen. They are moving the outlet for the microwave down about a foot. We are getting a hanging micro.
This is where the pellet stove is going to be.
Master bath arch way. We are going to probably put folding doors there.
Our new garage doors are finally installed.