Friday, April 17, 2009

Baby Herrbach 15 weeks 3 days

Here our the newest pictures of baby Herrbach at 15 weeks 3 days. The doctor still can not tell if it is a boy or girl but we have a detailed ultrasound appointment May 15 at the hospital with a special tech person, not my regular doctor. They say we will be able to find out then what it is :) Hooray!! For now all you get to see are the bone structure pictures (which are a bit creepy looking. LOL!!) of our little one.

I started feeling baby "kicking" on sunday, but found out that those "kicks" are actually our little boxer punching me with its fists. It puts its arms above the head and starts wacking at me! (we saw our baby doing this while these pictures were taken) Very weird feeling. They are still not strong enough for Chris to feel them.

Head on left with arms above head. Picture cuts off at mid torso.
Head on left, very defined skull bones. Left fist in top of picture.
Close-up Baby Herrbach giving us the evil eye :) You can see the lens of the eye in the left eye socket. Creepy looking picture.....I love it!!
Waving its arms above its head again. Trying to hit mommy!!
Kinda hard to see, but these are the feet. Look to the left side of the dark circle, those are two little feet.

Monday, April 13, 2009

New house updates....which are now old updates!

Sorry for the delay in updating house pictures....its been a little busy around here. Carpets should be getting installed today, so we will have more pictures to post later. For now, we have pictures of the new sink in the kitchen, shower doors in both bathrooms, mirrors and the finished counters in the kitchen. Things are coming along and we are still told that we should be closing on May 1. I don't know though, it seems like they still have a lot of work to get done before then. The outside paint still needs to be done, the driveway needs to be paved, the pellet stove needs to be installed, the kitchen appliances need to be installed, the property needs to be graded, the house needs to inspected by VA and we need to do a walk through where we point out the problems that we see (we are already starting a list of things that need to be fixed) and they need to have it all fixed before we sign papers. They need to hurry up if they expect us to sign the papers May 1.


Kitchen and part of the dining room. Counters are done and sink is installed.
The cupboards aren't covered in plastic anymore...we are outdated already.
Here is our new sink....we picked it out and told them to order it. Apparently they were having a hard time finding a stainless steel sink in their price range.....I found one in about 10 minutes at homedepot.com.
Nice faucet...it has the pull-out handle.
Shower doors in the guest bathroom.
Shower door in the master bathroom....they must have dropped it on the shower when installing because there is a chip out of the fiberglass shower on the outside (part of our list that needs to be fixed).
Big mirror in the master bathroom and faucets installed.
And this is the meadow near where we live that we will be taking our walks in...not a bad view either.